3 edition of Central Artery/Tunnel project found in the catalog.

Central Artery/Tunnel project

Central Artery/Tunnel project

  • 25 Want to read
  • 2 Currently reading

Published by The Office, The Office [distributor in Washington, D.C, [Gaithersburg, Md.] (P.O. Box 6015, Gaithersburg 20884-6015) .
Written in English

    Subjects:
  • Tunnels -- Massachusetts -- Boston -- Costs,
  • Express highways -- Massachusetts -- Boston -- Costs,
  • Federal aid to transportation -- Massachusetts -- Boston

  • Edition Notes

    Other titlesCentral Artery Tunnel project
    StatementUnited States General Accounting Office, Resources, Community, and Economic Development Division
    ContributionsUnited States. General Accounting Office. RCED
    The Physical Object
    FormatMicroform
    Pagination4 p.
    ID Numbers
    Open LibraryOL15009923M

    Tells the story of the planning, design and construction of the Big Dig, Boston's Central Artery and Tunnel project from a personal perspective. This most complex and technologically challenging project is a paradox of praises and blame. This book defends the professionals who planned, designed. Looking at the new roadway system by itself, the Central Artery and Tunnel project is solving that problem, with capacity to spare. It handles about , vehicles each weekday.

    The Central Artery/Tunnel project has had many noteworthy technological accomplishments that will serve to guide future urban construction. Among them are the deep slurry walls constructed in soft clay, the soil-freezing and tunnel-jacking operation at the Fort Point Channel crossing, and the Leonard P. Zakim Bunker Hill Bridge, which is the. The Central Artery/Tunnel (CA/T) Project relocated Boston’s elevated Central Artery below ground. The CA/T tunnel walls used soldier pile tremie concrete (SPTC) slurry walls as a component of the final structure. During later stages of construction, engineers discovered inclusions, clay pockets, and incompletely-filled areas in the SPTC walls.

    The Central Artery/Tunnel Project ("Big Dig"): United States (27) The Channel Tunnel: England and France (20) The Colorado River and Hoover Dam: United States (27) The Communications Satellite (COMSAT): United States (26) The Eiffel Tower: France (27) The Erie Canal: United States (14) The Federal Highway System: United States (17).   Project Complexity (Case study) 1. “Big Dig” Project THE CENTRAL ARTERY/TUNNEL PROJECT (CA/T) A CASE STUDY ON PROJECT COMPLEXITY. 2. Project Description Located in Boston, MA, on the northeast coast of the United States. Includes tunnels, highway interchange connections, bridges and pedestrian facilities 3. Project Map.


Share this book
You might also like
Royal Academy Illustrated 1954.

Royal Academy Illustrated 1954.

Mutagenesis

Mutagenesis

Federal financial regulatory agency reform

Federal financial regulatory agency reform

Gazetteer of the Ambala District 1883-84.

Gazetteer of the Ambala District 1883-84.

Planned utilization of the ground water basins of the coastal plain of Los Angeles County.

Planned utilization of the ground water basins of the coastal plain of Los Angeles County.

The difficult child and the teacher

The difficult child and the teacher

Austrian country inns & castles

Austrian country inns & castles

Catalogue of the Foulis Exhibition, Glasgow, 1913.

Catalogue of the Foulis Exhibition, Glasgow, 1913.

Standards support document, promulgated amendments to the national emission standard for asbestos

Standards support document, promulgated amendments to the national emission standard for asbestos

Within the Tides

Within the Tides

Central Artery/Tunnel project Download PDF EPUB FB2

COMPLETING THE “BIG DIG” Managing the Final Stages of Boston’s Central Artery/Tunnel Project. Committee for Review of the Project Management Practices Employed on the Boston Central Artery/Tunnel (“Big Dig”) Project. Board on Infrastructure and the Constructed Environment.

Division on Engineering and Physical Sciences. Boston's Central Artery/Tunnel Project, a mile system of bridges and underground highways and ramps, is the most expensive public works project ever undertaken in the United States.

The original cost estimate of $ billion has already been exceeded by $12 billion, and the project will not be completed untilseven years late. Recognized as the largest, most complex, and technologically challenging highway project in the history of the United States, the Central Artery/Tunnel Project (CA/T) was a mega transportation project in Boston that rerouted the Central Artery—the principal highway through the heart of the city—and constructed the extension of Interstate 90 with the construction of the Ted Williams Tunnel.

Other articles where Central Artery/Tunnel Project is discussed: Boston: Transportation: and a major construction project—the Central Artery/Tunnel Project, commonly called the Big Dig—was begun in The task involved replacing the elevated highway through the city with an 8-tolane underground expressway, rebuilding bridges, and boring a new tunnel under the harbour; the need to.

The Central Artery/Tunnel Project Management Agreement, setting out each agency's responsibilities, is included as Attachment 1. The State's CA/T Project Management Team is a blend of MTA staff and personnel representing Bechtel/Parsons-Brinckerhoff (B/PB).

The Central Artery/Tunnel Project was the largest, most challenging highway project in the history of the United States. It reduced traffic and improved mobility in one of America's oldest, most congested major cities.

It built a framework for continued growth in Massachusetts and New England. Additionally, it improved the local environment. Central Artery/Tunnel Project Massachusetts Turnpike Authority Boston, Massachusetts This article is the sixth and final paper in the series of articles on Boston, Massachusetts' mammoth Central Artery Tunnel Project.

This multi-billion dollar project is the largest highway construction job ever undertaken in the United Size: KB. After all, the Big Dig, the creation of a central artery tunnel running beneath crowded downtown Boston is an engineering marvel, the largest urban construction project in modern history, a fourteen-billion- dollar boondoggle in the eyes of by: 1.

The bridge picks up Interstate 93 traffic as it emerges from the new Central Artery tunnel and carries it across the Charles River to point north.

Keeping the city open during construction Completing the project in the middle of Boston without crippling the city was an incredible challenge. The Central Artery/Tunnel Project. The solution to the traffic mess and related problems was to implement a plan, called the Central Artery/Tunnel Project (CA/T.) The construction and operations would be placed under the supervision of the Massachusetts Turnpike Authority.

A massive project of this scale would take years of planning and. Special Geotechnical Testing: Central Artery/Tunnel Project in Boston, Massachusetts. The Central Artery/Tunnel Project (CA/T) in Boston, Massachusetts, is the largest urban highway construction project in the history of the interstate system.

The magnitude and complexity of the project called for a number of special geotechnical field testing by: 1. ITEC – Applied Project Management Case Study #6 Boston's Central Artery/Tunnel Project When it was opened in 19 5 9, Boston’s Central Artery highway was hailed as a marvel of engineering and forward-thinking urban planning.

Designed as an elevated six-lane high way through the middle of the city, the highway was intended to carry a traffic volume of 75, vehicles a day. The Big Dig or the Central Artery/Tunnel Project (CA/T) combined two large projects into one: the depression of Boston‟s Central Artery (Interstate 93) in Massachusetts, and the construction of a third tunnel under the Boston Harbor to link traffic to the Logan Size: 1MB.

In light of the threat presented by the terrorist attacks of Septemthe Massachusetts Turnpike Authority had to come up with a way to monitor its new $15 Billion underground highway.

Mass. Electric Construction Co. (MEC) was selected to be the installer for the security system, which would allow the new Central Artery/Tunnel (CA/T) system to be monitored from one central location. The Central Artery/Tunnel Project, known as the Big Dig, was a Massachusetts Department of Transportation construction project aimed to reduce traffic congestion and improve the environment in Boston, Massachusetts.

Initial planning and environmental impact studies began in Committee for Review of the Project Management Practices Employed on the Boston Central Artery/Tunnel ("Big Dig") Project ; Board on Infrastructure and the Constructed Environment, Division on Engineering and Physical Sciences, National Research Council of the National Archives ; National Academy of Engineering of the National Archives.

Spending so much money wisely is daunting. The good news: no matter how complex and expensive any future project is, it’s unlikely to be more so than the Big Dig, Massachusetts’s three-decade-long quest to bury and expand the Central Artery, Boston’s major interstate highway, and carve out a new underwater tunnel to Logan Airport.

: Federal Task Force on the Boston Central Artery Tunnel Project: Review of Project Oversight & Costs (): U.S. Government: BooksAuthor: U.S. Government. The Central Artery/Tunnel Project, known unofficially as the Big Dig, in Boston was the most expensive highway project in the U.S.

and consisted of countless errors. The project had errors throughout the plan and design that lead to escalating costs, scheduling overruns, leaks, design flaws, poor execution, substandard materials and even four.

construction, the Central Artery/Tunnel Project, famously known as the Big Dig, was the largest infrastructure project ever undertaken in the United States and the largest inner-city construction project in the world.

Its degree of difficulty was far greater than that of the other megaprojects of the twentieth century, the Panama Canal, the. Book Hotels, Flights, & Rental Cars; Relaunch tutorial hints NEW!

Create a custom My Map; Share or Embed Map; Print your Map; Get Help; Search the Web; Central Artery Tunnel Project. 50 Massport Haul Rd, Boston, MA () Claim this .The Big Dig project in Boston has been rife with problems since it began. The Boston Globe and cover the cost overruns, tunnel leaks, and deadly ceiling collapse resulting from this project.

On Sept. 15,water spewed through fissures in the Central Artery tunnel.Some call the Central Artery/Tunnel Project in Boston, Massachusetts, the "largest, most complex and technologically challenging highway project in American history.".